Xcel’s

Highlights from Xcel’s Solar*Rewards Installer Update – July 2019
Xcel Energy Colorado has reached 50,000 Customer-Sited Solar Installations!In 2018, the Solar*Rewards team handled more than 8,700 applications which led to over 6,400 on-site solar installations. This number will continue to grow as nearly 20 on-site solar projects are being interconnected, per day. Congratulations! 2020-2021 Renewable Energy (RE) PlanThe proposed plan has been filed and can be found under docket # 19A-0369EMedium Solar*Rewards Program Q3 is Open 6 MW available (+ add’l [...]
3
Like
Save
​Materials from Xcel’s recent stakeholder meeting
Attached is information that Xcel Energy circulated at a recent stakeholder meeting . It  shows interesting trends in a number of solar market categories. SHG Meeting – 09.22.2017   The post ​Materials from Xcel’s recent stakeholder meeting appeared first on Colorado Solar Energy Industries Association. [...]
1
Like
Save
Recap from Xcel’s Solar Stakeholder Meeting 6/27
This document provides a recap of Xcel’s recent solar stakeholder meeting, which included topics on Solar*Rewards, Solar Connect, and other items.     The post Recap from Xcel’s Solar Stakeholder Meeting 6/27 appeared first on Colorado Solar Energy Industries Association. [...]
2
Like
Save
Over 200 Turn Out to Oppose Xcel’s Phase II Rate Case
COSEIA – June 9th 2016 Rally to Protect Solar Solar system owners, installers, public policy advocates and a large contingent of people from the new Denver office of SunRun all turned out June 9th for a hearing at the Public Utilities Commission on what is potentially the most significant PUC filing in Xcel Energy’s “Our Energy Future” initiative. While some speakers appeared to track the points made in Xcel’s wide-ranging PR campaign – that the new rate struc [...]
3
Like
Save